Bitumen 60/70
Loading and delivery conditions
Sale of 60/70 penetrating bitumen is carried out in two forms bulk and metal barrels. Delivery of the cargo is carried out by transshipment at the border designated by the buyer
Scheduling: The loading process at the origin will begin no later than 15 days after the contract is drawn up and signed
Transportation: To transport about 2000 tons of bitumen about 84 edged trailers are required, assuming a loading capacity of 24 tons per trailer
Daily loading capacity: The maximum loading capacity of the warehouse is 10 trailers per day, and logistics planning is done accordingly
Widely used in road construction and highway maintenance
Ideal for hot mix asphalt production in moderate climates
Suitable for base and wearing course layers of pavement
Used in waterproofing and insulation industries
Persian saffron
Roasted Pistachio
Latest PRODUCTS
-
خرمای تازه ایرانی همراه مغز گردو و پسته
$1,500.00Original price was: $1,500.00.$1,390.00Current price is: $1,390.00. -
مفصل گردان (بلبرینگ داخلی) —Lake Petro $100.00
-
پراکسید کربنات سدیم – عامل سفیدکننده و پاککننده کارآمد
BEST OF THE WEEK
-
Fiberglass Plate (G10/FR4)
-
Picker Sweet Corn
-
Blue Ski Boots
Rated 5.00 out of 5$178.89